Micro Hydro Electric Power System in Colorado Part 9

156 0 0
Home Hydro Power Micro Hydro Electric Power System in Colorado Part 9
Published on August 19, 2015

Construction – Part 2.

Weir diversion is constructed with diversion of water by use of temporary dam.

Footings for pipe bridge are installed. An early arrival of Winter brings an end to construction for this season.

Creek Diversion, Weir intake, Pipe bridge, Powerhouse slab are all well underway.

We will return in the Spring.